The original back in 2002
1
I was just going to paint the room and put off the remodel for a while...  Then I found the hole behind the sink.  Things just cascaded from there.
2
Ok, now I can see things more clearly.  With a little adjustment to some framing, I can do what I want.
3
More inspection demolition
4
Now the poorly installed framing (on the little short wall) has been removed, still have to figure out what to put back in its place...
5
Original plumbing and outlet location
6
New sink and vanity ready to be installed
7
Rest of drywall removed, a little more framing adjustment in the back corner, and new drain has been installed.
8
Another view of the new drain line
9
Ah, more challenges- found two blind electrical junction boxes when I removed the drywall.  One is visible, the other is above the opening inside the ceiling.
10
Supply plumbing finished, and first piece of new drywall in place.  Electrical rough ins completed.
11
Top of back wall
12
Front wall showing new relocated junction boxes behind what will be a hinged access panel.
13
Valves and relocated outlet have been installed
14
New nailer installed for the little short wall
15
New drywall in place with corner beads
16
Bottom of walls, new drywall
17
Front wall, new drywall
18
Front wall, new drywall
19
New drywall, corner beads
20
Linoleum removed, finished spackling
21
Finished spackling
22
Finished spackling
23
Finished spackling
24